Some key projects successfully executed includes:
-
1998 – 2001, Sub Contractors to Stone & Webster Inc, USA
- I. Volta River Authority (VRA) 330 Megawatts Combined Cycle Takoradi Thermal Plant (T1);
II. Warrantee Engineers during the (18 Month Defect Liability Period) responsible for coordinating with Client on operational & technical activities on behalf of Sone & Webster Inc.
III. Liquidated about 600 Punch-list items covering mechanical, electrical, civil, instrumentation & control engineering up to contract closure.
- 2013 & 2014 – Completed on sub-contract to CT-Technologies Aps, Denmark on the installation an ultra-modern 3,000Ton capacity cold storage facility to We2 Sea Foods Ltd, Tema Ghana. Works included specialised piping works incorporating customised electrical, instrumentation & controls systems.
-
2014 & 2015 – NORPALM (Ghana) Limited – Oil Palm Cultivation & Processing Mechanical & Civil Engineering Works: (Mill Upgrade Project)
- I. Part Fabrication & Installation of Sterilizer including process piping, auxiliaries, and thermal insulation.
II. Design, Fabrication, and Erection of Structural Steel infrastructure to the extension of the sterilizer bays.
III. Design, Fabrication, and Erection of Structural Steel infrastructure to the New Boiler House.
IV. Installation of 25Ton/Hour Fossil Fuel Water Tube Steam Boiler & Accessories. Associated Piping & thermal Insulation including support to Commissioning. - 2016- Ghana Specialty Fats & Industries Limited (GSFIL) complete installation of a 25Ton/Hr biomass energy plant and all related ancillaries such as piping, insulation etc.
- 2020- JUABEN OIL MILLS (JOM) construction of a 20Ton/Hr biomass energy plant with a 1.0MW steam turbine & ancillaries such as piping, refractory & ancillaries (burners, soot blowers, piping thermal insulation etc.)
- 2021- Wilmar Africa Limited (WAL) Fabrication of a 1600MT biomass Silo including an integrated feeding system.
- 2021- Tema Oil Refinery (TOR) Installation of crude oil heater and ancillary works including: heater modules, stacks, platforms, refractory and ancillaries (burners, soot blowers, piping (P5), thermal insulation etc.)
- 2022- Wilmar Africa Limited (WAL) Fabrication and erection of a 41 meter high double sleeve chimney complete with insulation.
- 2022- Ghana Specialty Fats & Industries Limited (GSFIL) Installation/erection of a Shea nuts destoner plant complete with cyclones, bucket elevators, screw conveyors etc.
- 2023- Wilmar Africa Limited (WAL) Installation of a 25 Ton/Hour Vyncke biomass steam energy plant and all related ancillaries such as piping, insulation etc.