Some key projects successfully executed includes:
- January 2013 & May 2013 – Benso Oil Palm Plantation (BOPP) civil works on reinforced concrete foundations for the fresh fruit bunch loading ramp & clarifier.
-
October 2014 & September 2014 – NORPALM (Ghana) Limited
- Civil works on Reinforced Concrete Foundations to facilitate the installation of a 25Ton/Hr Biomass fuel-fired Steam Boiler Plant & accessories, 1.0MW Elliot Steam Turbine, Boiler Housing Steel structures, Stacks, and Steam Blow-down systems.
- Additional related civil works included retainer walls, drains, and access ways.
- October 2015 & January 2016 –Twifo Oil Palm Plantation (TOPP) Civil works on Reinforced Concrete Foundations to facilitate the installation of a 30Ton/Hr Biomass fuel-fired Steam Boiler Plant & accessories, Boiler Housing Steel structures, Stacks, and Steam Blow-down systems. Additional related civil works included retainer walls, drains, and access ways.
- August 2016 & January 2017 – WILMAR Ghana Specialty Fats Industries Limited (GSFIL) Engineering Design and Construction of Reinforced Concrete Foundation Base and Retaining Walls for 2No 1500 Ton Shea butter Steel Storage Tanks.
-
December 2017 & September 2019 - Plantation Socfinaf Ghana (PSG) Limited Construction of an Integrated Palm Oil Mill at Daboase. Scope included:
- Construction of the main Factory
- All Earthworks
- Mill Building, Sterilization & Blown-Down Stations etc.
- Building (5no) Effluent Systems,
- All major Roads & Drains, Central Workshop,
- Administration blocks, Cafeteria, Change Rooms, etc.
- 2020- JUABEN OIL MILLS (JOM) Civil design and construction for a 20Ton/Hr biomass energy plant and an integrated moving floor system with retaining walls.
- 2021 – Benso Oil Palm Plantation (BOPP) civil/mechanical works for a new clarification and filtration water treatment system.
- 2022-Ongoing: Wilmar Africa Limited (WAL) Civil construction of a 25TPH load distribution energy pressure boiler plant.