Selected passion projects We have worked on and are deeply proud of!
In the Mining Sector in reference, Amitaab has since 2003 successfully executed the under-listed SMPP related projects:
2004 – Anglogold Ashanti (Iduapriem Mine, Tarkwa, Ghana): Construction of 1 (one) 1,850M3 Leach Processing Tank; Related structural steel works; NDTs (Radiography & X-ray); and installation of Agitator & Drive systems.
2005 – Anglogold Ashanti (Iduapriem Mine, Tarkwa, Ghana): Fabrication & Erection of Steel Table for Primary Crusher Rom Bin
2007 – Anglogold Ashanti (Iduapriem Mine, Tarkwa, Ghana): Decommissioning of Old Processing Facility for the Terebie Mine.
2007 – 2009 Anglogold Ashanti Iduapriem Mine – Component Contractor on the Structural, Mechanical & Process Piping for the Iduapriem Expansion Project.
Fabrication & installation of Launders 300Tons Structural Steel Fabrication & Erection works, including Gratings;
Fabrication & installation of Structural Steel ‘Cast-In’ items to the Crushing & Stock Piling facilities; Installation of Pump & Piping works to the central Oil Lubrication Systems to Crushers and others.
2009 – Anglogold Ashanti Induapriem Mine – Fuse Welding & laying of 2.5KM 350mm Dia HDPE Effluent pipeline including installation of Pumps & Fittings.
2010 – 2011 Main Contractor Owere Mining Limited – Structural, Mechanical, Process, and Piping (SMPP) engineering works on rehabilitation of an disservice gold mining equipment including;
Rehabilitation of Old Ball Mill (drive, pinion, and girth gear systems, clutch, shell, and rotating conditioning, etc), CIP & absorption tanks, launders, belt conveyor systems, cyclones, structural steel works, and related electrical installations.
2011 – Anglogold Ashanti Obuasi Mine Ghana – Sub contractor to P2W on the execution of a 275Mᶾ/HR Waste Water (Effluent) treatment Facility
2012 – Bogoso Resources Goldmine, Ghana – Sub contractor to P2W on the execution of a 275Mᶾ/HR Waste Water (Effluent) treatment Facility